Pool resurfacing is a must-do treatment to maintain the pool operating smoothly and looking as lovely as when you first saw it. Resurfacing a pool can be done in various ways, depending on the type of pool surface you have – quartz, pebble, tile, cement, plaster, and so on. While the majority of individuals will pay a professional to handle the job, others will attempt to resurface a pool on their own. This allows them to save pool resurfacing cost that is sometimes expenses. Although this is a difficult task, it is doable if you have the necessary tools, time, and knowledge.
1. Drain the water from the pool
To resurface a pool, the first step is to drain water from it. Depending on your area, some local authorities require a permit when draining water. Check to see if you need any permits before you start. A sump pump can be rented to drain all of the water out of the swimming pool as quickly as possible. Before proceeding, make sure the pool has been completely drained as well as dried.
2. Prepare its surface
Your swimming pool is most likely covered in dirt, debris, and leaves. Before proceeding, you may see some rust stains that require removal. Even the tiniest amount of residue can affect your pool resurfacing project. It’s a wise decision to pressure wash the swimming pool after removing the majority of the debris to eliminate any remaining algae and stains.
To clean and prepare the surface of some pools, a chemical wash or treatment may be necessary. To guarantee that the new material sticks, sandblast, or chisel the underlying concrete. Put more emphasis on a little portion of the pool at a time. Depending on its size, this pool renovation process could take up to three days.
3. Prime its surface
A particular primer epoxy is required before putting the refinishing solution on most pool surfaces. Apply the primer according to the package instructions, wearing gloves and masks to protect yourself from harmful fumes or chemicals. Before proceeding, paint the pool’s surface with the primer and dry it completely. Depending on the size of your pool, this pool remodeling Orlando process should require between two and four hours.
4. Finish the swimming pool’s surface
After the primer has dried, begin painting the pool with resurfacing solution or topcoat epoxy. Begin painting from deep to shallow, as specified by the manufacturer. Before applying the second coat, let the top coat dry completely. Sand the pool in between coatings to make sure the next layer adheres appropriately. Three to four coatings are required for most pools. This could take a few hours or overnight, depending on the weather.
5. Refill the pool water
Don’t immediately replenish the pool after you’ve applied the last top coat. Most manufacturers suggest letting the swimming pool dry for five to seven days after applying the final coat of epoxy. After this period has passed, you can refill its water to enjoy its new appearance.
When to call the professionals
Resurfacing a pool requires time and effort. Professional pool resurfacing contractors have the skills, resources, and knowledge to perform the job in two to three days, saving you time and money. If this DIY project appears to be too difficult to complete on your own, don’t be afraid to seek professional assistance. Start by searching pool resurfacing near me then choose the most trustworthy for this job.